
- Project Name Break Room Painting
- Client McDonalds Kincardine
- Date March 2023
- Location Kincardine
Project Summary
The McDonalds needed their breakroom to be fixed and painted. The walls needed a lot of patching with drywall – holes from pins, tape ripping off the paint and drywall, and even a fist sized hole – and then a good coat of paint. The hole was large enough that I had to cut and put in a patch, and I filled in all the other scrapes and holes. After sanding and another coat, I gave a coat of primer and then two coats of paint. The large spot of no paint is where a large scheduling board goes, so I was to leave that. I also removed an old and inactive vent switch, and put on new covers for outlets to make it all look nice.

